1 00:00:11,950 --> 00:00:07,050 [Music] 2 00:00:17,029 --> 00:00:14,959 film report number 12 covers progress 3 00:00:22,310 --> 00:00:17,039 during the period September October and 4 00:00:25,070 --> 00:00:22,320 November 1965 development manufacturing 5 00:00:26,450 --> 00:00:25,080 and testing of s1c stages by the Boeing 6 00:00:29,620 --> 00:00:26,460 Company and the Marshall Center 7 00:00:33,049 --> 00:00:29,630 continued throughout the quarter in 8 00:00:35,000 --> 00:00:33,059 October responsibility for s1c static 9 00:00:37,490 --> 00:00:35,010 testing at Marshall was transferred to 10 00:00:40,459 --> 00:00:37,500 Boeing but MSFC in a supervisory 11 00:00:42,080 --> 00:00:40,469 capacity the first firing utilizing 12 00:00:44,330 --> 00:00:42,090 automatic check out equipment in the 13 00:00:47,900 --> 00:00:44,340 blockhouse was held on October 8 the 14 00:00:50,420 --> 00:00:47,910 test stage designated s1 CT was fired 15 00:00:53,299 --> 00:00:50,430 for 40 seconds with all elements 16 00:00:55,790 --> 00:00:53,309 functioning as programmed a 96 second 17 00:00:58,520 --> 00:00:55,800 firing was held on November 3rd and on 18 00:01:01,250 --> 00:00:58,530 November 24th a successful full duration 19 00:01:06,859 --> 00:01:01,260 firing of 150 seconds in the automatic 20 00:01:09,080 --> 00:01:06,869 mode was conducted Marshall assembly of 21 00:01:12,469 --> 00:01:09,090 the first Saturn 5 booster flight stage 22 00:01:14,420 --> 00:01:12,479 s1 c1 was completed on September 27th 23 00:01:16,399 --> 00:01:14,430 and the stage was moved from the 24 00:01:18,499 --> 00:01:16,409 manufacturing engineering lab to the 25 00:01:22,429 --> 00:01:18,509 quality and reliability assurance lab 26 00:01:24,679 --> 00:01:22,439 for a post manufacturing check out check 27 00:01:27,260 --> 00:01:24,689 out here a combination of manual and 28 00:01:30,020 --> 00:01:27,270 automatic modes included basic power 29 00:01:31,999 --> 00:01:30,030 tests electromagnetic interference tests 30 00:01:34,520 --> 00:01:32,009 testing of basic instrumentation 31 00:01:36,679 --> 00:01:34,530 automatic calibration and gaseous 32 00:01:39,440 --> 00:01:36,689 pressure system testing of each of the 33 00:01:42,679 --> 00:01:39,450 five f-1 engines plus the overall stage 34 00:01:44,870 --> 00:01:42,689 the s1 c1 is expected to be ready for 35 00:01:49,670 --> 00:01:44,880 delivery to the static test stand in 36 00:01:51,950 --> 00:01:49,680 January 1966 the forward stage assembly 37 00:01:54,050 --> 00:01:51,960 comprising LOX tank inter tank and 38 00:01:57,080 --> 00:01:54,060 forward skirt for the second flight 39 00:01:58,639 --> 00:01:57,090 stage s1 c2 was completed at the 40 00:02:01,340 --> 00:01:58,649 vertical Assembly Building and was 41 00:02:03,980 --> 00:02:01,350 transferred on November 8 to Marshalls 42 00:02:05,870 --> 00:02:03,990 newly finished 100-foot tall horizontal 43 00:02:08,660 --> 00:02:05,880 assembly building for mating to the aft 44 00:02:11,449 --> 00:02:08,670 stage assembly comprising fuel tank and 45 00:02:13,790 --> 00:02:11,459 thrust structure the new facility has a 46 00:02:15,770 --> 00:02:13,800 large high bay area allowing 47 00:02:17,600 --> 00:02:15,780 train support above the stage which was 48 00:02:21,920 --> 00:02:17,610 not possible in the building where s1 49 00:02:23,450 --> 00:02:21,930 Siwon was assembled horizontal mating of 50 00:02:25,610 --> 00:02:23,460 the forward stage assembly to the 51 00:02:28,010 --> 00:02:25,620 previously completed apt stage assembly 52 00:02:31,460 --> 00:02:28,020 was accomplished on November 9th and 53 00:02:34,220 --> 00:02:31,470 component installation is continuing in 54 00:02:37,190 --> 00:02:34,230 marshals load test tower structural load 55 00:02:39,830 --> 00:02:37,200 testing of the s1 CS aft test stage 56 00:02:42,140 --> 00:02:39,840 hitter take fuel tank thrust structure 57 00:02:45,320 --> 00:02:42,150 was successfully conducted during the 58 00:02:47,900 --> 00:02:45,330 quarter at Marshalls Michou assembly 59 00:02:50,450 --> 00:02:47,910 operations in New Orleans the s-1 C D 60 00:02:52,340 --> 00:02:50,460 dynamic test stage which had been moved 61 00:02:54,410 --> 00:02:52,350 into the stage test building from the 62 00:02:57,530 --> 00:02:54,420 horizontal installation position in the 63 00:02:59,540 --> 00:02:57,540 plant area on August 25th received only 64 00:03:02,390 --> 00:02:59,550 minor damage when the building itself 65 00:03:06,080 --> 00:03:02,400 was severely hit by Hurricane Betsy on 66 00:03:07,100 --> 00:03:06,090 September 9th cell number 1 where s1 CD 67 00:03:09,260 --> 00:03:07,110 was installed 68 00:03:11,300 --> 00:03:09,270 fortunately received less damage than 69 00:03:13,880 --> 00:03:11,310 the other three cells and was quickly 70 00:03:16,400 --> 00:03:13,890 repaired the hurricane damage has not 71 00:03:20,240 --> 00:03:16,410 seriously affected s1c production 72 00:03:22,280 --> 00:03:20,250 schedules at nishu following checkout 73 00:03:25,510 --> 00:03:22,290 and weighing of the dynamic test stage 74 00:03:28,040 --> 00:03:25,520 which is the first Misha assembled s1 C 75 00:03:30,110 --> 00:03:28,050 it was moved from the stage test 76 00:03:32,510 --> 00:03:30,120 building to the Misha barge docks on 77 00:03:36,440 --> 00:03:32,520 October 5th for shipment to the Marshall 78 00:03:41,120 --> 00:03:36,450 Center the stage arrived at MSFC on 79 00:03:43,340 --> 00:03:41,130 October 14th in January 1966 s1 CD will 80 00:03:46,070 --> 00:03:43,350 be installed in the saturn v dynamic 81 00:03:49,250 --> 00:03:46,080 test stand where preparations are now 82 00:03:51,530 --> 00:03:49,260 underway for acceptance a hydro dynamic 83 00:03:53,870 --> 00:03:51,540 support system consisting of four large 84 00:03:56,750 --> 00:03:53,880 concrete pillars topped by hydraulic 85 00:03:59,030 --> 00:03:56,760 actuators with hydrostatic bearings will 86 00:04:01,520 --> 00:03:59,040 enable the vehicle to float virtually 87 00:04:03,650 --> 00:04:01,530 frictionless on a film of oil during 88 00:04:06,320 --> 00:04:03,660 vibration testing simulating flight 89 00:04:08,750 --> 00:04:06,330 conditions steel bumpers are being 90 00:04:10,940 --> 00:04:08,760 erected inside the test stand to prevent 91 00:04:14,930 --> 00:04:10,950 the vehicle from sliding off the support 92 00:04:16,940 --> 00:04:14,940 pedestals a roof has also been installed 93 00:04:19,070 --> 00:04:16,950 atop the stand to prevent a chimney 94 00:04:23,300 --> 00:04:19,080 effect whereby gusts of wind might 95 00:04:25,880 --> 00:04:23,310 destroy test measurements if a summit is 96 00:04:27,620 --> 00:04:25,890 checkout stage s1 CF which was 97 00:04:29,660 --> 00:04:27,630 transferred from issues vertical 98 00:04:32,300 --> 00:04:29,670 Assembly Building into the plant area in 99 00:04:34,790 --> 00:04:32,310 late August under wet installation of 100 00:04:36,500 --> 00:04:34,800 tubing vowels and electrical electronic 101 00:04:38,570 --> 00:04:36,510 systems until mid-november 102 00:04:41,420 --> 00:04:38,580 when it was moved to the stage test 103 00:04:42,890 --> 00:04:41,430 building for check out the F stage is 104 00:04:47,720 --> 00:04:42,900 slated for shipment to Kennedy Space 105 00:04:50,930 --> 00:04:47,730 Center in late January 1966 the first 106 00:04:53,360 --> 00:04:50,940 for flight rated engines for s1 c3 the 107 00:04:55,250 --> 00:04:53,370 third flight stage arrived at me shoe 108 00:04:57,950 --> 00:04:55,260 from Rocketdyne during the quarter and 109 00:05:01,880 --> 00:04:57,960 are undergoing checkout the fifth engine 110 00:05:05,180 --> 00:05:01,890 is due in December vertical assembly of 111 00:05:07,310 --> 00:05:05,190 s1 c3 began on October 22nd with the 112 00:05:10,820 --> 00:05:07,320 installation of the thrust structure in 113 00:05:14,060 --> 00:05:10,830 the VAB major component assembly 114 00:05:16,370 --> 00:05:14,070 continued on s1 c4 the upper fuel 115 00:05:20,480 --> 00:05:16,380 bulkhead was reworked due to hurricane 116 00:05:22,820 --> 00:05:20,490 damage production of bulkheads for s1 c5 117 00:05:25,220 --> 00:05:22,830 began at miss you in October with the 118 00:05:34,130 --> 00:05:25,230 milling of fittings in Gore FX's and 119 00:05:35,750 --> 00:05:34,140 bases s2 structural testing was 120 00:05:37,490 --> 00:05:35,760 completed this quarter at the see of 121 00:05:39,880 --> 00:05:37,500 each facility of north american aviation 122 00:05:42,380 --> 00:05:39,890 space and information systems division 123 00:05:44,510 --> 00:05:42,390 although the structural test stage 124 00:05:46,850 --> 00:05:44,520 collapsed in the final test on September 125 00:05:49,880 --> 00:05:46,860 29th the failure occurred at an 126 00:05:51,830 --> 00:05:49,890 acceptable load level testing duplicated 127 00:05:55,490 --> 00:05:51,840 in flight loads under structure at the 128 00:05:57,890 --> 00:05:55,500 end of s1 see stage boost marshal and s 129 00:06:00,470 --> 00:05:57,900 NID engineers are investigating the mode 130 00:06:03,440 --> 00:06:00,480 of failure original plans were for 131 00:06:06,350 --> 00:06:03,450 modification of s2 s for dynamic testing 132 00:06:08,390 --> 00:06:06,360 but as a result of the stage loss the 133 00:06:12,470 --> 00:06:08,400 old systems test stage will be used 134 00:06:15,470 --> 00:06:12,480 instead the old system stage designated 135 00:06:17,780 --> 00:06:15,480 s2 t was completed by s anti-d during 136 00:06:19,100 --> 00:06:17,790 September and on October 1st were 137 00:06:22,010 --> 00:06:19,110 shipped to the Marshall setters 138 00:06:25,070 --> 00:06:22,020 Mississippi test facility after static 139 00:06:27,080 --> 00:06:25,080 firing their early next year s 2 T will 140 00:06:30,470 --> 00:06:27,090 be modified and sent to Marshall for a 141 00:06:32,510 --> 00:06:30,480 dynamic testing at the Santa Susana 142 00:06:34,700 --> 00:06:32,520 field laboratory preparations were 143 00:06:37,610 --> 00:06:34,710 underway this quarter for cluster firing 144 00:06:40,430 --> 00:06:37,620 of the s2 battleship stage using flight 145 00:06:41,450 --> 00:06:40,440 configuration j2 engines the first 146 00:06:44,870 --> 00:06:41,460 firing is set 147 00:06:47,480 --> 00:06:44,880 or December also at Santa Susana 148 00:06:49,340 --> 00:06:47,490 successful completion of the s2 common 149 00:06:51,950 --> 00:06:49,350 bulkhead test tank program was 150 00:06:54,140 --> 00:06:51,960 accomplished in early November the tests 151 00:06:56,110 --> 00:06:54,150 investigated structural integrity and 152 00:07:00,589 --> 00:06:56,120 limit conditions in a cryogenic 153 00:07:02,659 --> 00:07:00,599 environment vertical buildup of the s2f 154 00:07:05,320 --> 00:07:02,669 facilities check out stage was completed 155 00:07:07,760 --> 00:07:05,330 at seal beach during the report period 156 00:07:11,749 --> 00:07:07,770 systems installation and insulation 157 00:07:14,629 --> 00:07:11,759 closeout are now in progress vertical 158 00:07:17,150 --> 00:07:14,639 assembly is underway on s21 the first 159 00:07:19,279 --> 00:07:17,160 flight stage during November the aft 160 00:07:21,770 --> 00:07:19,289 locks bulkhead was successfully tested 161 00:07:24,230 --> 00:07:21,780 to 105 percent of pressure for 10 162 00:07:27,529 --> 00:07:24,240 minutes and is now available for stage 163 00:07:29,990 --> 00:07:27,539 final assembly the or would lh2 bulkhead 164 00:07:33,830 --> 00:07:30,000 and common bulkhead were also completed 165 00:07:35,600 --> 00:07:33,840 and tested during the quarter automatic 166 00:07:38,149 --> 00:07:35,610 check out consoles are being delivered 167 00:07:40,610 --> 00:07:38,159 and installed in essen tidies a duo 168 00:07:42,379 --> 00:07:40,620 vertical checkout building the automatic 169 00:07:44,360 --> 00:07:42,389 equipment is undergoing tests in 170 00:07:48,050 --> 00:07:44,370 preparation for vertical checkout of the 171 00:07:49,939 --> 00:07:48,060 first flight stage fabrication of 172 00:07:52,010 --> 00:07:49,949 structural components and assembly of 173 00:07:55,240 --> 00:07:52,020 major structural sub assemblies are 174 00:07:58,010 --> 00:07:55,250 underway on flight stages 2 & 3 175 00:07:59,390 --> 00:07:58,020 the activation was completed in early 176 00:08:02,110 --> 00:07:59,400 November at the electromechanical 177 00:08:04,879 --> 00:08:02,120 mock-up area at the downy facility 178 00:08:06,279 --> 00:08:04,889 conclusion of compatibility interference 179 00:08:09,649 --> 00:08:06,289 and automatic check out equipment 180 00:08:12,230 --> 00:08:09,659 verification testing terminated the EMM 181 00:08:14,390 --> 00:08:12,240 function and GSE is now being 182 00:08:23,240 --> 00:08:14,400 reallocated to other locations within 183 00:08:26,180 --> 00:08:23,250 Essen Tidy a Douglas Aircraft Company 184 00:08:28,249 --> 00:08:26,190 Sacramento test facility the s4 B 185 00:08:30,279 --> 00:08:28,259 battleship stage was removed from beta 186 00:08:32,899 --> 00:08:30,289 test stand number 1 in September 187 00:08:35,810 --> 00:08:32,909 following completion last quarter of the 188 00:08:38,540 --> 00:08:35,820 battleship test-firing program the stage 189 00:08:40,550 --> 00:08:38,550 will be delivered in early January 1966 190 00:08:42,560 --> 00:08:40,560 to the Arnold engineering development 191 00:08:46,910 --> 00:08:42,570 center at Tullahoma Tennessee for 192 00:08:49,400 --> 00:08:46,920 altitude simulation firing tests after 193 00:08:51,620 --> 00:08:49,410 removal of the battleship stage latest 194 00:08:54,050 --> 00:08:51,630 and one was converted in preparation for 195 00:08:55,250 --> 00:08:54,060 acceptance testing of the s4v flight 196 00:08:58,220 --> 00:08:55,260 stages of 197 00:09:01,700 --> 00:08:58,230 both Saturn 1b and five configurations 198 00:09:06,620 --> 00:09:01,710 the first flight stage designated 501 199 00:09:09,260 --> 00:09:06,630 will be installed in February 1966 the 200 00:09:11,750 --> 00:09:09,270 s4b common bulkhead test specimen was 201 00:09:13,790 --> 00:09:11,760 delivered to sacto in September for 202 00:09:16,970 --> 00:09:13,800 structural testing under cryogenic 203 00:09:19,520 --> 00:09:16,980 conditions utilizing a converted s for 204 00:09:23,810 --> 00:09:19,530 stand testing will get underway next 205 00:09:25,490 --> 00:09:23,820 quarter also its acto installation of 206 00:09:27,670 --> 00:09:25,500 ground support equipment at the vertical 207 00:09:30,410 --> 00:09:27,680 checkout lab is nearing completion 208 00:09:33,320 --> 00:09:30,420 initial use of the new facility for 209 00:09:37,030 --> 00:09:33,330 systems check out of the 500 St stage 210 00:09:40,160 --> 00:09:37,040 simulator is slated for late December at 211 00:09:41,740 --> 00:09:40,170 the Assembly check-out tower complex at 212 00:09:44,570 --> 00:09:41,750 Douglass's Huntington Beach facility 213 00:09:49,190 --> 00:09:44,580 final installations are underway on the 214 00:09:51,470 --> 00:09:49,200 first flight stage the j2 engine for 501 215 00:09:53,570 --> 00:09:51,480 received from Rocketdyne last quarter 216 00:09:55,910 --> 00:09:53,580 underwent check out in the components 217 00:09:59,780 --> 00:09:55,920 tests lab prior to joining to the stage 218 00:10:02,510 --> 00:09:59,790 in mid-november work continued on the 219 00:10:04,100 --> 00:10:02,520 second flight stage 502 with the 220 00:10:06,020 --> 00:10:04,110 installing of insulation during 221 00:10:09,830 --> 00:10:06,030 completion by the end of the report 222 00:10:11,740 --> 00:10:09,840 period tank components fabrication is 223 00:10:14,810 --> 00:10:11,750 progressing for the third flight stage 224 00:10:18,530 --> 00:10:14,820 503 with tech joining operations 225 00:10:21,350 --> 00:10:18,540 scheduled next quarter qualification 226 00:10:23,930 --> 00:10:21,360 testing of s4b flight stage components 227 00:10:26,590 --> 00:10:23,940 continued with such items as vibration 228 00:10:28,820 --> 00:10:26,600 testing of the low pressure fuel duct 229 00:10:32,270 --> 00:10:28,830 vibration testing of the liquid oxygen 230 00:10:34,910 --> 00:10:32,280 chill down return duct cryogenic testing 231 00:10:42,610 --> 00:10:34,920 of the aft umbilical kit and cycle 232 00:10:47,840 --> 00:10:45,470 the first transcontinental trip for an 233 00:10:50,510 --> 00:10:47,850 f1 engine by truck transport was 234 00:10:53,900 --> 00:10:50,520 accomplished this quarter previously all 235 00:10:55,820 --> 00:10:53,910 transport was by air engine F 20 20 left 236 00:10:58,760 --> 00:10:55,830 rocket Dynes Canoga Park California 237 00:11:00,530 --> 00:10:58,770 plant on September 20 night and arrived 238 00:11:03,590 --> 00:11:00,540 in good condition at the Marshall Center 239 00:11:05,210 --> 00:11:03,600 in Alabama on October 13th the road 240 00:11:08,420 --> 00:11:05,220 transport feasibility study was 241 00:11:09,020 --> 00:11:08,430 initiated by MSFC because of the limited 242 00:11:12,640 --> 00:11:09,030 available 243 00:11:15,680 --> 00:11:12,650 of aircraft capable of carrying the f1 244 00:11:17,960 --> 00:11:15,690 this scale model depicts two of the 245 00:11:19,970 --> 00:11:17,970 seven f1 engine vertical assembly 246 00:11:22,820 --> 00:11:19,980 stations to be constructed at Canoga 247 00:11:24,890 --> 00:11:22,830 Park conversion from horizontal assembly 248 00:11:26,960 --> 00:11:24,900 to vertical is part of Rocketdyne 249 00:11:29,330 --> 00:11:26,970 general program for improvement of 250 00:11:31,790 --> 00:11:29,340 production line techniques in addition 251 00:11:33,740 --> 00:11:31,800 to the vertical assembly stations three 252 00:11:35,780 --> 00:11:33,750 electrical and mechanical checkout 253 00:11:39,560 --> 00:11:35,790 stations and one optical alignment 254 00:11:41,570 --> 00:11:39,570 station will be built construction work 255 00:11:44,000 --> 00:11:41,580 is now underway on the first three 256 00:11:46,450 --> 00:11:44,010 vertical assembly stations the entire 257 00:11:51,740 --> 00:11:46,460 line is expected to be finished early in 258 00:11:53,870 --> 00:11:51,750 1966 a new 2500 ton capacity liquid 259 00:11:55,820 --> 00:11:53,880 oxygen storage tank has been completed 260 00:11:58,460 --> 00:11:55,830 at the edwards field laboratory in 261 00:12:00,620 --> 00:11:58,470 california the new storage tank allows 262 00:12:02,180 --> 00:12:00,630 Rocketdyne to meet increased testing 263 00:12:05,770 --> 00:12:02,190 schedules for both research and 264 00:12:09,500 --> 00:12:05,780 development and production f-1 engines 265 00:12:11,420 --> 00:12:09,510 to f1 engine checkout console assemblies 266 00:12:13,700 --> 00:12:11,430 were delivered barakatuh in this quarter 267 00:12:16,010 --> 00:12:13,710 to the Boeing Company at Michou for 268 00:12:18,830 --> 00:12:16,020 installation in the first f1 checkout 269 00:12:21,260 --> 00:12:18,840 station there a third unit is slated for 270 00:12:22,970 --> 00:12:21,270 delivery in December the console 271 00:12:25,580 --> 00:12:22,980 provides electrical pneumatic and 272 00:12:27,740 --> 00:12:25,590 hydraulic inputs and outputs for the f1 273 00:12:29,810 --> 00:12:27,750 engine for performing specific 274 00:12:33,260 --> 00:12:29,820 functional tests to determine its 275 00:12:35,900 --> 00:12:33,270 operational condition at the marshall 276 00:12:38,750 --> 00:12:35,910 center's new single position f1 static 277 00:12:41,540 --> 00:12:38,760 test and activated last quarter pre 278 00:12:43,310 --> 00:12:41,550 firings totaling approximately 360 279 00:12:53,510 --> 00:12:43,320 seconds were conducted during this 280 00:12:55,580 --> 00:12:53,520 report during the Rocketdyne built j2 281 00:12:57,500 --> 00:12:55,590 flight rating test engine underwent 282 00:13:00,500 --> 00:12:57,510 teardown inspection in September 283 00:13:03,440 --> 00:13:00,510 following completion of frt last quarter 284 00:13:05,960 --> 00:13:03,450 the engine number 2023 which had been 285 00:13:09,200 --> 00:13:05,970 static fired 25 times for a total of 286 00:13:11,450 --> 00:13:09,210 2700 60 seconds was completely 287 00:13:15,860 --> 00:13:11,460 disassembled for detailed inspection of 288 00:13:18,320 --> 00:13:15,870 all components following preparations 289 00:13:19,160 --> 00:13:18,330 for the j2 qualification test series at 290 00:13:21,499 --> 00:13:19,170 the end of the 291 00:13:23,929 --> 00:13:21,509 the initial static firing of engine 292 00:13:26,749 --> 00:13:23,939 number 2032 who was conducted on the 293 00:13:28,900 --> 00:13:26,759 Delta to stand at Santa Susana the 294 00:13:30,729 --> 00:13:28,910 engine was fired for full duration of 295 00:13:33,470 --> 00:13:30,739 470 seconds 296 00:13:35,989 --> 00:13:33,480 qualification test series which will man 297 00:13:38,809 --> 00:13:35,999 rate the j2 engine is scheduled for 298 00:13:40,729 --> 00:13:38,819 completion by December 31st the engine 299 00:13:42,859 --> 00:13:40,739 will be fired 30 times for an 300 00:13:46,429 --> 00:13:42,869 accumulated duration of three thousand 301 00:13:48,349 --> 00:13:46,439 seven hundred fifty seconds radio 302 00:13:50,299 --> 00:13:48,359 interference tests as a part of the 303 00:13:52,309 --> 00:13:50,309 qualification program were conducted 304 00:13:55,039 --> 00:13:52,319 this quarter at rocky Dean's Los Angeles 305 00:13:57,079 --> 00:13:55,049 division overall purpose of the tests is 306 00:13:59,359 --> 00:13:57,089 to show that the engine will not emit 307 00:14:02,499 --> 00:13:59,369 undesirable interference or be 308 00:14:04,879 --> 00:14:02,509 susceptible to external interference 309 00:14:07,460 --> 00:14:04,889 rocky dines research and development 310 00:14:09,859 --> 00:14:07,470 program on j2 engine thermal insulation 311 00:14:12,169 --> 00:14:09,869 continued during the quarter a test 312 00:14:14,689 --> 00:14:12,179 sample was subjected to various degrees 313 00:14:17,720 --> 00:14:14,699 of temperature with a plasma gun as the 314 00:14:19,849 --> 00:14:17,730 external heat source the various moles 315 00:14:24,710 --> 00:14:19,859 are representative of engine hardware 316 00:14:26,419 --> 00:14:24,720 configurations a total of 11 j2 engines 317 00:14:28,970 --> 00:14:26,429 was delivered by rocket day in this 318 00:14:32,989 --> 00:14:28,980 quarter to the stage users including the 319 00:14:36,679 --> 00:14:32,999 final engine for s2 501 all five engines 320 00:14:39,169 --> 00:14:36,689 for s2 502 the remaining 4s to 321 00:14:43,909 --> 00:14:39,179 battleship stage engines and the flight 322 00:14:45,919 --> 00:14:43,919 engine for s4 b 502 the first three 323 00:14:47,720 --> 00:14:45,929 start ago j2 engine delivered to 324 00:14:51,139 --> 00:14:47,730 marshall underwent three scattering 325 00:14:54,159 --> 00:14:51,149 firings the longest for 418 seconds in 326 00:14:57,169 --> 00:14:54,169 MSFC ss4 v battleship tests state 327 00:15:07,009 --> 00:14:57,179 restart tests are expected to begin next 328 00:15:09,109 --> 00:15:07,019 quarter throughout the quarter ground 329 00:15:11,629 --> 00:15:09,119 test instrument units were assembled and 330 00:15:13,759 --> 00:15:11,639 tested assembly of the breadboard test 331 00:15:15,889 --> 00:15:13,769 unit was near completion with delivery 332 00:15:18,499 --> 00:15:15,899 to Marshalls system development facility 333 00:15:21,019 --> 00:15:18,509 due in early December assembly of the 334 00:15:24,439 --> 00:15:21,029 flight systems iu was near completion by 335 00:15:26,359 --> 00:15:24,449 the end of November the three checkout 336 00:15:28,639 --> 00:15:26,369 trailer is used to check out the flight 337 00:15:31,340 --> 00:15:28,649 systems iu were delivered to Marshall by 338 00:15:32,900 --> 00:15:31,350 IBM Huntsville in September the check 339 00:15:35,150 --> 00:15:32,910 out equipment covering two 340 00:15:37,370 --> 00:15:35,160 Nitori radiofrequency and a digital data 341 00:15:39,410 --> 00:15:37,380 acquisition system is mounted in 342 00:15:41,360 --> 00:15:39,420 trailers so it can later be sent to 343 00:15:44,110 --> 00:15:41,370 Douglas Aircraft in California to 344 00:15:46,490 --> 00:15:44,120 monitor flight simulation tests 345 00:15:50,390 --> 00:15:46,500 structural assembly of the first flight 346 00:15:52,970 --> 00:15:50,400 instrument unit SIU 501 began in late 347 00:15:54,740 --> 00:15:52,980 November at IBM Huntsville component 348 00:15:59,540 --> 00:15:54,750 assembly is scheduled to start in mid 349 00:16:02,360 --> 00:15:59,550 January 1966 the second structural test 350 00:16:04,040 --> 00:16:02,370 I you assembled by IBM Huntsville using 351 00:16:07,100 --> 00:16:04,050 segments manufactured by North American 352 00:16:10,040 --> 00:16:07,110 Aviation was completed in early October 353 00:16:13,790 --> 00:16:10,050 and moved to MSFC for structural testing 354 00:16:15,710 --> 00:16:13,800 scheduled for December at Walley labs 355 00:16:18,350 --> 00:16:15,720 Huntsville facility high intensity 356 00:16:20,630 --> 00:16:18,360 reverberation tests chamber acoustic 357 00:16:22,640 --> 00:16:20,640 vibration testing of the vibration test 358 00:16:25,430 --> 00:16:22,650 I you were successfully conducted in 359 00:16:27,590 --> 00:16:25,440 mid-november the tremendous noise levels 360 00:16:30,140 --> 00:16:27,600 produced by the Saturn 5 first stage 361 00:16:32,120 --> 00:16:30,150 engines were simulated by a pneumatic 362 00:16:34,760 --> 00:16:32,130 sound source producing sound pressure 363 00:16:37,640 --> 00:16:34,770 levels up to just above 150 decibels 364 00:16:46,160 --> 00:16:37,650 over a twenty five to ten thousand cycle 365 00:16:48,410 --> 00:16:46,170 per second frequency range at the 366 00:16:51,560 --> 00:16:48,420 Marshall Center dynamic testing of the 367 00:16:53,510 --> 00:16:51,570 s4 BD dynamic test stage in conjunction 368 00:16:55,760 --> 00:16:53,520 with the dynamic test instrument unit 369 00:16:57,800 --> 00:16:55,770 and an Apollo spacecraft was 370 00:17:01,250 --> 00:16:57,810 successfully completed during the report 371 00:17:04,160 --> 00:17:01,260 period at Marshalls Mississippi test 372 00:17:07,040 --> 00:17:04,170 facility activation efforts on the first 373 00:17:09,590 --> 00:17:07,050 s two static tests and designated a2 374 00:17:12,050 --> 00:17:09,600 were directed early this quarter two 375 00:17:14,750 --> 00:17:12,060 priority items to prepare the stand for 376 00:17:17,780 --> 00:17:14,760 installation of the s2 t all system 377 00:17:19,850 --> 00:17:17,790 stage delivered by s and ID beneficial 378 00:17:24,530 --> 00:17:19,860 occupancy of the stand was accepted on 379 00:17:26,780 --> 00:17:24,540 October 1st on October 19th the s2 t was 380 00:17:30,050 --> 00:17:26,790 installed in the stand by s and ID and 381 00:17:32,180 --> 00:17:30,060 support personnel the s2 t to be used 382 00:17:34,100 --> 00:17:32,190 for checkout a facility systems ground 383 00:17:36,680 --> 00:17:34,110 support equipment and the stage itself 384 00:17:41,660 --> 00:17:36,690 will be the first vehicle test-fired at 385 00:17:44,240 --> 00:17:41,670 mt f in early 1966 work on the second s 386 00:17:46,310 --> 00:17:44,250 to stand designated a1 progressed 387 00:17:48,080 --> 00:17:46,320 steadily during the quarter 388 00:17:50,330 --> 00:17:48,090 concrete work on the service corps and 389 00:17:52,580 --> 00:17:50,340 front vents is complete and steel 390 00:17:57,289 --> 00:17:52,590 erection below the flame deflector was 391 00:17:59,659 --> 00:17:57,299 started at the s1 ceased and MTFs other 392 00:18:02,180 --> 00:17:59,669 principal test element overall progress 393 00:18:04,210 --> 00:18:02,190 is on schedule concrete work on the 394 00:18:06,230 --> 00:18:04,220 center and east pier is finished and 395 00:18:08,659 --> 00:18:06,240 installation of steel for the flame 396 00:18:11,299 --> 00:18:08,669 deflector and engine removal platform is 397 00:18:13,159 --> 00:18:11,309 well underway concrete work on the West 398 00:18:17,180 --> 00:18:13,169 Pier is complete through the sixth floor 399 00:18:20,539 --> 00:18:17,190 level in summary September October and 400 00:18:22,820 --> 00:18:20,549 November 1965 four months of continuing 401 00:18:25,009 --> 00:18:22,830 progress along a broad front with 402 00:18:27,259 --> 00:18:25,019 achievements such as the first s1c 403 00:18:30,649 --> 00:18:27,269 static firing using automatic check out 404 00:18:35,210 --> 00:18:30,659 equipment completion of assembly of the 405 00:18:38,090 --> 00:18:35,220 first s1 c flight stage delivery of the 406 00:18:41,869 --> 00:18:38,100 first Misha produced s1 see the dynamic 407 00:18:45,200 --> 00:18:41,879 test stage completion of Assembly of the 408 00:18:47,330 --> 00:18:45,210 s2 all systems test stage and its 409 00:18:51,049 --> 00:18:47,340 delivery to mississippi test facility 410 00:18:53,450 --> 00:18:51,059 for static firing successful testing of 411 00:18:57,289 --> 00:18:53,460 the s4 the dynamic test stage and 412 00:19:00,279 --> 00:18:57,299 dynamic test iu successful acoustic 413 00:19:02,690 --> 00:19:00,289 testing of the vibration test iu 414 00:19:07,039 --> 00:19:02,700 improvement of one engine production 415 00:19:08,790 --> 00:19:07,049 techniques and initiation of j2 engine 416 00:19:09,890 --> 00:19:08,800 qualification testing 417 00:19:11,940 --> 00:19:09,900 [Music]